
The project adopted Elecod 500kW/1075kWh container BESS, the system configured 4 units of Monet-125kW PCS, and integrates battery, fire protection, refrigeration, isolation transformer, dynamic environment monitoring and energy management, friendly grid adaptability, accepts grid dispatching, carries out active and reactive power compensation, supports peak shaving and valley filling, demand-side response, assists new energy grid integration and other applications. [pdf]

The project will install climate-adapted floating solar photovoltaic (FPV), a battery energy storage system (BESS), a transmission and distribution network, productive uses of energy (PUE), such as electric vehicles (EVs) including an e-boat for the operation and maintenance of the FPV system, EV charging stations, electric artificial reefs and wave breakers for coastal protection, and capacity building, including on disaster preparedness. [pdf]

The construction of a 50 MW/200 MWh Battery Storage Power Station on a 5-hectare area built upon the “Baganuur” substation in the Baganuur district of Ulaanbaatar is progressing successfully.On October 5, 2024, Prime Minister of Mongolia Oyun-Erdene Luvsannamsrai visited the Battery Storage Power Station, a project implemented by the Governor’s Office of Ulaanbaatar as part of the Government of Mongolia’s energy reform. [pdf]

According to Huawei data on RRU/BBU needs per site, the typical 5G site has power needs of over 11.5 kilowatts, up nearly 70% from a base station deploying a mix of 2G, 3G and 4G radios. 5G macro base stations may require several new, power-hungry components, including microwave or millimeter wave transceivers, field-programmable gate arrays (FPGAs), faster data converters, high-power/low-noise amplifiers and integrated MIMO antennas. [pdf]
We are committed to excellence in solar container and energy storage solutions.
With complete control over our manufacturing process, we ensure the highest quality standards in every solar container and BESS system we deliver.